{"id":1329,"date":"2020-04-16T18:23:08","date_gmt":"2020-04-16T16:23:08","guid":{"rendered":"https:\/\/eveneum.com\/case-study-oszczednosci\/"},"modified":"2026-01-15T16:38:10","modified_gmt":"2026-01-15T15:38:10","slug":"case-study-savings","status":"publish","type":"post","link":"https:\/\/eveneum.com\/en\/blog\/case-study-savings\/","title":{"rendered":"Case study. The C-class, or smart savings 4.0."},"content":{"rendered":"<h2 class=\"wp-block-heading\">\n\t\tIncrease savings and reduce labour intensity in the area of normals.\n\t<\/h2>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Industry:<\/strong> rail<\/h4>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Project Objective:<\/strong> process improvements and savings<\/h4>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Areas:<\/strong> logistics, purchasing, finance, production, R&amp;D<\/h4>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Duration:<\/strong> two weeks<\/h4>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Number of people in the project:<\/strong> 5<\/h4>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/eveneum.com\/wp-content\/uploads\/2025\/12\/coaching-negocjacyjny-warstzaty-Eveneum.jpg\" alt=\"savings\" title=\"coaching-negotiation-warstzaty-Eveneum\"\/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">\n\t\tEstimated results of the project\n\t<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">\n\t\t1\n\t\t\t\t\t PLN 1 million reduction in the value of the warehouse\n\t\t168\n\t\t\t\t\t168 fewer hours per month for administration\n\t\t3\n\t\t\t\t\t3 million zlotys of TCO savings\n<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\n\t\tWhy are standard parts a challenge and not a source of savings for manufacturing companies?\n\t<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">As part of the initiative <a href=\"http:\/\/www.whypurchasing.com\" target=\"_blank\" rel=\"noopener\">Why Shopping?<\/a> As part of the Why Purchasing? initiative, we spoke with Pawe\u0142 Kudzia from Woodward company. He emphasized the challenges of generating savings faced by companies that have an extensive supply chain. Many suppliers provide components that are ultimately assembled in production. He described his supply chain as \"low volume - high mix\". You can watch the entire recording in the accompanying video.<\/p>\n\n\n\n<iframe loading=\"lazy\" width=\"560\" height=\"315\" src=\"https:\/\/www.youtube.com\/embed\/obWM92MZces\" frameborder=\"0\" allow=\"accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen=\"\"><\/iframe>\n\n\n\n<h3 class=\"wp-block-heading\">\n\t\tHow does this relate to our case study?\n\t<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">We often encounter the situation described by Pawe\u0142 among our clients. Companies that are OEMs or are positioned high in the value chain are often characterized by the immortal Pareto principle:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><h4>20% of the purchased expensive components account for 80% of the material costs and savings<\/h4><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><h4><span style=\"color: initial; font-family: -apple-system, BlinkMacSystemFont, &quot;Segoe UI&quot;, Roboto, Oxygen-Sans, Ubuntu, Cantarell, &quot;Helvetica Neue&quot;, sans-serif;\">However, what strikes us the most is another proportion:<\/span><\/h4><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><h4>80% of the process costs and troubles are generated by components with relatively low prices but complex logistics and supplied by a large number of suppliers. In other words, the remaining 80% from Pareto.<\/h4><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><h4><span style=\"color: initial; font-family: -apple-system, BlinkMacSystemFont, &quot;Segoe UI&quot;, Roboto, Oxygen-Sans, Ubuntu, Cantarell, &quot;Helvetica Neue&quot;, sans-serif;\"><strong>The Pareto principle doesn't work in tail spent management. Solutions are needed that fundamentally change the way we operate to document attractive savings. Today, modern Industry 4.0 technology comes to our aid. It allows us to network devices distributed throughout the production facility with the supplier system.<\/strong><\/span><\/h4><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We had to face precisely such a situation with a client in the railway industry (nowadays often referred to as Mobility).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\n\t\tWhat do market trends say?\n\t<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">According to recent purchasing trends, c-class components are classified as \u201eoutsourcing by capability\u201d, especially in a low-volume-high mix situation, according to the balance of power matrix. It is assumed that for this type of component, a company wishing to focus on its core business should consider and implement lean solutions. These solutions are based on a service whose key performance indicators are: availability, flexibility, autonomy, savings. The support offered by the provider is to ensure that the client has the flexibility to deliver its core business. Current and future trends in c-suite management point to a move away from the purchase of components towards the purchase of a service related to component availability at an optimal cost.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/eveneum.com\/wp-content\/uploads\/2025\/12\/Kraljic-ATK.png\" alt=\"savings\" title=\"Kraljic ATK\"\/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">\n\t\tDetails of a case study in a rail\/mobility company\n\t<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">\n\t\tAccounting and controlling\n\t<\/h4>\n\n\n\n<h4 class=\"wp-block-heading\">Challenges identified:<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Manual and time-consuming invoice processing<\/strong><\/li>\n\n\n\n<li>Nearly 15,000 invoices per month<\/li>\n\n\n\n<li>13,000 invoices represent the actual capacity of a 7-person department<\/li>\n\n\n\n<li>An average of 2,100 invoices per person per month (100 invoices per day!)<strong>100 invoices a day!<\/strong>)<\/li>\n\n\n\n<li><strong>Overtime and backlogs up to one week in invoice entry<\/strong> reaching <strong>one week<\/strong> in the entry of invoices<\/li>\n\n\n\n<li>Late payments to suppliers result in a backlog of firefighting in purchasing, controlling, and accounting departments <strong>firefighting in purchasing, controlling and accounting<\/strong><\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Proposed solutions:<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Standardizing invoicing terms in monthly cycles<\/strong> on a monthly basis<\/li>\n\n\n\n<li>rapid uplift <strong>Rapidly increasing the percentage of electronic invoices from 12% to 80%<\/strong><\/li>\n\n\n\n<li>Enforcing the requirement for suppliers to include order numbers and customer index numbers on invoices <strong>indication of the order number on invoices<\/strong> and customer index numbers<\/li>\n\n\n\n<li>Improving the electronic document workflow for resolving discrepancies <strong>electronic workflow<\/strong> in clarifying inconsistencies<\/li>\n\n\n\n<li>Introducing the \"noPO, no Pay\" indicator to increase purchasing transparency <strong>\u201enoPO,no Pay\u201d <\/strong>in order to make purchasing more transparent<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">\u00a0Production <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Challenges identified:<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Production documentation is not always updated in a timely manner compared to the actual execution of a particular component. Planners order components that are not needed and fail to order the necessary ones<\/strong> vs. the actual execution of a component. Planners are ordering components that are not needed and not ordering components that are needed<\/li>\n\n\n\n<li>Some assembly sockets contain a large number of excess and unused components <strong>a lot of elements that are in excess and not used<\/strong><\/li>\n\n\n\n<li>Team leaders spend up to 2 hours per day searching for components needed for production <strong>2 hours a day to look for elements<\/strong>, that they need to produce<\/li>\n\n\n\n<li>The existing ERP system does not track the visibility of components and their inventory after they are issued from the warehouse <strong>the ERP system does not see the elements<\/strong> and their stocks after removal from storage<\/li>\n\n\n\n<li>Inventory policy is not effectively enforced, and \"excess\" components are often not returned to the warehouse <strong>the \u201eredundant\u201d elements are often not returned to the warehouse<\/strong><\/li>\n\n\n\n<li>The warehouse frequently issues fewer components than what is required by the production demand<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Proposed solutions:<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hiring a specialized company to map the streams of C-class parts in production <strong>mapping of streams<\/strong> c-class parts in production<\/li>\n\n\n\n<li>Implementing a modern kanban system based on IoT and remote communication with the supplier's cloud, in line with Industry 4.0 principles <strong>IoT<\/strong> and remote communication with <strong>the provider's cloud, <\/strong>in accordance with <strong>Industry 4.0<\/strong><\/li>\n\n\n\n<li>deeper <strong>analysis of the specification amendment process<\/strong> from design through to new commissioning engineers and fitters to consolidate changes\/know-how and eliminate incorrect ordering in subsequent builds within a vehicle series<\/li>\n\n\n\n<li>deeper <strong>analysis of errors and the reasons for these errors in the process<\/strong> demand&gt; booking&gt; issuing from stock&gt; receipt in production to eliminate shortages and downtime<br><\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">\n\t\tLogistics and purchasing\n\t<\/h4>\n\n\n\n<h4 class=\"wp-block-heading\">Challenges identified:<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the purchasing department processes almost <strong>70,000 orders per year<\/strong> for c-class verified components<\/li>\n\n\n\n<li>This constitutes <strong>70%<\/strong> of all orders being processed<\/li>\n\n\n\n<li><strong>lack of specialisation of merchants,<\/strong> are responsible for the entire logistics and purchasing process (end-to-end)<\/li>\n\n\n\n<li>merchant works on a daily basis on approx. <strong>30 orders<\/strong>, consisting on average of <strong>10 lines\/indices<\/strong>. To create an order in the system you need <strong>approximately 5 min<\/strong><\/li>\n\n\n\n<li>each order is subject to <strong>the approval process in accordance with the delegation policy<\/strong><\/li>\n\n\n\n<li><strong>the entire organisation<\/strong> devotes to a single order a total of approx. <strong>30 min<\/strong><\/li>\n\n\n\n<li>merchant <strong>spends about 3-4 hours a day<\/strong> for order processing<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Proposed solutions:<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>outsourced c-class service by\u00a0 <strong>minimise administrative work<\/strong> merchant<\/li>\n\n\n\n<li>Implementing a solution to <strong>live\u201e analysis of stock levels, consumption, parts location and trends based on historical consumption<\/strong><\/li>\n\n\n\n<li>The solution recommended by Eveneum should <strong>unlock resources<\/strong>\u00a0in number <strong>4.5 hours per day<\/strong> (3 hours of unproductive work on orders and 1.5 hours on invoices per day)<\/li>\n\n\n\n<li>we recommend that the resources freed up be allocated to <a href=\"https:\/\/eveneum.com\/en\/oferta\/sourcing\/global-sourcing\/definiowanie-strategii-zakupowej\/\"><strong>purchasing category management<\/strong><\/a>, contract optimisation or the establishment of an advanced early project planning team<\/li>\n\n\n\n<li><a href=\"https:\/\/eveneum.com\/en\/oferta\/business-consulting\/development-of-purchasing-structures-and-processes\/\">development of the set <strong>key performance indicators<\/strong> and management by objectives of the purchasing organisation in response to the needs and strategy of the company<\/a><br><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Zwi\u0119kszenie oszcz\u0119dno\u015bci i redukcja pracoch\u0142onno\u015bci w obszarze normali\u00f3w. Bran\u017ca: kolejowa Cel projektu: usprawnienie proces\u00f3w i oszcz\u0119dno\u015bci Obszary: logistyka, zakupy, finanse, produkcja, B+R Czas trwania: dwa tygodnie Liczba os\u00f3b w projekcie: 5 Szacowane rezultaty projektu 1 milion z\u0142otych redukcji warto\u015bci magazynu 168 godzin mniej miesi\u0119cznie na administracj\u0119 3 milion\u00f3w z\u0142otych oszcz\u0119dno\u015bci TCO Dlaczego normalia s\u0105 wyzwaniem [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1189,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[1,37,48,73,74,75],"tags":[],"class_list":["post-1329","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bez-kategorii","category-doradztwo-biznesowe","category-opracowywanie-struktur-i-procesow-zakupowych","category-audyty-firm","category-case-studies","category-case-study"],"acf":[],"_links":{"self":[{"href":"https:\/\/eveneum.com\/en\/wp-json\/wp\/v2\/posts\/1329","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eveneum.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eveneum.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eveneum.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/eveneum.com\/en\/wp-json\/wp\/v2\/comments?post=1329"}],"version-history":[{"count":2,"href":"https:\/\/eveneum.com\/en\/wp-json\/wp\/v2\/posts\/1329\/revisions"}],"predecessor-version":[{"id":2160,"href":"https:\/\/eveneum.com\/en\/wp-json\/wp\/v2\/posts\/1329\/revisions\/2160"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eveneum.com\/en\/wp-json\/wp\/v2\/media\/1189"}],"wp:attachment":[{"href":"https:\/\/eveneum.com\/en\/wp-json\/wp\/v2\/media?parent=1329"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eveneum.com\/en\/wp-json\/wp\/v2\/categories?post=1329"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eveneum.com\/en\/wp-json\/wp\/v2\/tags?post=1329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}